Strategic Lean Thinking and Value Management for Gravel Roads in Zambia (eBook)

Strategic Lean Thinking and Value Management for Gravel Roads in Zambia (eBook)

Richard Kasongo
Richard Kasongo
Prezzo:
€ 39,99
Compra EPUB
Prezzo:
€ 39,99
Compra EPUB

Formato

:
EPUB
Cloud: Scopri di più
Lingua: Inglese
Editore: GRIN Verlag
Codice EAN: 9783668094918
Anno pubblicazione: 2015
Scopri QUI come leggere i tuoi eBook

Note legali

NOTE LEGALI

a) Garanzia legale, Pagamenti, Consegne, Diritto di recesso
b) Informazioni sul prezzo
Il prezzo barrato corrisponde al prezzo di vendita al pubblico al lordo di IVA e al netto delle spese di spedizione
Il prezzo barrato dei libri italiani corrisponde al prezzo di copertina.
I libri in inglese di Libraccio sono di provenienza americana o inglese.
Libraccio riceve quotidianamente i prodotti dagli USA e dalla Gran Bretagna, pagandone i costi di importazione, spedizione in Italia ecc.
Il prezzo in EURO è fissato da Libraccio e, in alcuni casi, può discostarsi leggermente dal cambio dollaro/euro o sterlina/euro del giorno. Il prezzo che pagherai sarà quello in EURO al momento della conferma dell'ordine.
In ogni caso potrai verificare la convenienza dei nostri prezzi rispetto ad altri siti italiani e, in moltissimi casi, anche rispetto all'acquisto su siti americani o inglesi.
c) Disponibilità
I termini relativi alla disponibilità dei prodotti sono indicati nelle Condizioni generali di vendita.

Disponibilità immediata
L'articolo è immediatamente disponibile presso Libraccio e saremo in grado di procedere con la spedizione entro un giorno lavorativo.
Nota: La disponibilità prevista fa riferimento a singole disponibilità.

Disponibile in giorni o settimane (ad es. "3-5-10 giorni", "4-5 settimane" )
L'articolo sarà disponibile entro le tempistiche indicate, necessarie per ricevere l'articolo dai nostri fornitori e preparare la spedizione.
Nota: La disponibilità prevista fa riferimento a singole disponibilità.

Prenotazione libri scolastici
Il servizio ti permette di prenotare libri scolastici nuovi che risultano non disponibili al momento dell'acquisto.

Attualmente non disponibile
L'articolo sarà disponibile ma non sappiamo ancora quando. Inserisci la tua mail dalla scheda prodotto attivando il servizio Libraccio “avvisami” e sarai contattato quando sarà ordinabile.

Difficile reperibilità
Abbiamo dei problemi nel reperire il prodotto. Il fornitore non ci dà informazioni sulla sua reperibilità, ma se desideri comunque effettuare l'ordine, cercheremo di averlo nei tempi indicati. Se non sarà possibile, ti avvertiremo via e-mail e l'ordine verrà cancellato.
Chiudi

Descrizione

Doctoral Thesis / Dissertation from the year 2015 in the subject Engineering - General, , course: Civil Engineering Management (Construction Project Management), language: English, abstract: This research topic is entitled ‘Strategic Lean Thinking and Value Management for Gravel Roads’. The study captured 82 respondents as research sample to a case study of Output Performance - Based Contracts (OPRCs) for the Construction and Maintenance of Gravel Roads in Zambia. Purposive sampling was used as most research participants were drawn from second generation OPRCs that were active between 2009 and 2014. The study was aimed at devising new Construction and Maintenance Contract methods for gravel roads that are based on “Lean Thinking and Value Management” philosophies in Zambia. The established epistemological background to the study is that most of the Zambian road network is of gravel or earth standards and is therefore, imperative that they are well maintained to attain desired service levels to properly serve the intended beneficiaries (the road users). The Road Development Agency Annual Report of 2009 indicated that 33,000 Km of the total 40,671 Km core road network, is classified as gravel roads (unpaved) , which are at the moment mostly in a deteriorated state. The study revealed that currently in Zambia, Gravel Road Construction projects are commonly being realised through the use of traditional Contracts such as admeasured; by the use of Bills of Quantities (BOQs), the Lump sum and Cost plus, etc. These are mainly short term form of Contracts which to some extent, lack some components of sustainable maintenance regimes, thereby rendering the Government and other Promoters efforts futile as gravel roads sooner or later deteriorate just after the first rain season upon their construction. This was theoretical perspective which served as driver to the “Research problem”. The study noted that current forms of Contracts did not inspire, aspire and spur the spirit of ownership as the local people were left out in the planning and design stages of gravel road projects. Despite all the attempts made by Government, through the RDA and other implementing Agencies, the Road Construction Industry in general, has failed to get the best value for money through the use of these conventional types of Contracts. One of the reasons for this failure according to Womack and Jones (2003), ‘is that it is hard to define and realise value, this is partly because most Producers [Road Contractors] want to make what they are already making and partly because Customers only know some variant of what they are already getting’.